B-1 test Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.
B-2 test Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.
B-3 test Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.
Youwind Model is a disrupting cloud-based IT system that optimizes the financials of an offshore wind farm, while integrating engineering functions with a usability mindset as never imagined before.
Youwind Model performs powerful analytics, handles big data and keeps traceability of al steps and users, resulting in a revolutionary system for the development of an offshore wind farm project, from early stages to installation planning and logistics.
When starting a new offshore wind project, complex multi-criteria challenges arise: Wind Resource, Foundations, Selection (Bottom and Floating), Bathymetry, Cementation types, Turbine types, Ports, Regulation, Yield, and many more.
The constant use of experts and resources are required to best account for the future CAPEX/OPEX and LCOE of the future project. Pixel simplifies that.
When starting a new offshore wind project, complex multi-criteria challenges arise: Wind Resource, Foundations, Selection (Bottom and Floating), Bathymetry, Cementation types, Turbine types, Ports, Regulation, Yield, and many more.
The constant use of experts and resources are required to best account for the future CAPEX/OPEX and LCOE of the future project. Pixel simplifies that.
One day delay waiting with an offshore installation vessel can cost up to 250 thousand euros. Components installation can compromise about 35% of offshore CAPEX. By choosing the correct installation harbour, analysing the right metaocean data and installation assests, costs and risks can be kept at a minimum with OptiWindow. It is time to get a grip on weather downtime estimates thanks to OptiWindow's powerful statistics methods on big data.
Learn moreOur areas of expertise are early stage screening, development, budgeting, and contract negotiation when designing offshore wind projects.
Youwind performs project cost predictions based on statistical models and advanved simulations that covers capital expenditure, operational expenditure, development cost and decommissioning costs.
Youwind experts team provides a wide range of services and trainings for developers, suppliers, investment banks, and authorities working in the offshore wind industry.
At Youwind we are a ream of diverse professionals with years of experience in multiple fields of technology, engineering and sustainability.
Learn moreDevelopment Update: February 2023
Providing the right tools for the challenges...
Wind Europe Electric City 2021...